Preparations are in full swing
Preparations are underway. All material of the dismounted GC32 catamaran has to be tested. Since the carbon construction of the boat is built under very high tension, it is especially important to check the loaded areas carefully and to replace them in cases of doubt.
At the same time the branding of the newly founded Black Star Sailing Team is applied and glued. Here you can see the port hull and the training sails.
Soon the first training with overhauled boat and new crew starts.