Maiden voyage with new branding

8f4038c8-1b47-4faa-8b15-263958b5d0b1

After arriving without a hitch we could set up the GC32 Black Star for the first time. The entire team was present and so the work could be divided between the team members. While the rig has being adjusted by some, the others were able to assemble the platform. Finally, we were able to crane in at our scheduled time. We are ready!

The platform is taken from the trailer and assembled.
The platform is taken from the trailer and assembled.
After several hours of work, we are ready to launch.
After several hours of work, we are ready to launch.